WASTEWATER TREATMENT PLANT OF KISSAMOS GULF AND DISPOSAL PIPELINE OF THE MUNICIPALITY OF KISSAMOS, CHANAI PREFECTURE – SUB-PROJECT I: WWTP
AWARD AUTHORITY
OADYK
CONTRACTOR
THALIS E.S. S.A.
REGEON
Region of Crete
PROGRESS
The object of the project is the construction of the WWTP of Kissamos
The WWTP includes the following stages:
- Pretreatment Unit, which consists of:
- The Entrance Well
- The Consolidation projects
- The ventilated Sand Collector - Grease Collector
- The Parshall type Supply Meter with measuring equipment
- Biological Processing Unit, which consists of:
- Distribution Shaft 1 to the Aeration Tanks
- An Aeration Tank
- Distribution Shaft 2 to the Sedimentation Tanks
- A Sedimentation Tank
- The Recirculation and Excess Sludge Pumping Station
- Sludge Treatment Unit, which consists of:
- One Sludge Thickening Tank
- The thickened sludge Pumping Station
- The sludge Mechanical Dewatering Building
- Sludge storage and loading transport equipment and other equipment
- Disinfection Unit, which consists of:
- The Chlorination Tank
- The Chlorination Complex
- The Dechlorination Complex