UTILIZATION OF THE AMARI RIVERS DAM RESERVOIR:
AWARD AUTHORITY
Crete Development Organization S.A.
CONTRACTOR
CONSORTIUM THALIS ES SA – TERNA S.A. – KONSTANTINIDIS S.A.
REGEON
PROGRESS
The contract pertains to the design, construction, six-month trial operation, and one-year regular operation of the Water Treatment Facility supplied by the Amari Rivers Dam Reservoir.

Infrastructure and auxiliary works, including:
- Internal road network.
- Water supply, firefighting, and industrial water networks.
- Intake, return, and irrigation networks.
- Internal stormwater drainage network.
- Electrical installations, including generator sets (Gensets).
- External aqueduct networks.
Specifically, the project includes:
The inlet works.
- Installation of a hydro turbine for energy production with a nominal capacity of 148 kW.
- A storage tank for untreated water, which can supply the irrigation network.
- Pre-aeration tank.
- Pre-ozonation unit.
- Ozone generation unit.
- Service building for the pre-ozonation unit and a water supply/firefighting storage tank.
- Distribution shaft.
- Rapid mixing tanks.
- Three coagulation-sedimentation tanks.
- A five-bed filtration unit.
- Backwash water storage tank.
- Clean water storage tank.
- Wastewater treatment unit for backwash water.
- Gravity thickener.
- Dewatering building.
- Chemical building.
- Workshop building.
- Administration building.
Guard post.