UTILIZATION OF THE AMARI RIVERS DAM RESERVOIR:

AWARD AUTHORITY

Crete Development Organization S.A.

CONTRACTOR

CONSORTIUM THALIS ES SA – TERNA S.A. – KONSTANTINIDIS S.A.

REGEON

PROGRESS

0%

The contract pertains to the design, construction, six-month trial operation, and one-year regular operation of the Water Treatment Facility supplied by the Amari Rivers Dam Reservoir.

Infrastructure and auxiliary works, including:

  • Internal road network.
  • Water supply, firefighting, and industrial water networks.
  • Intake, return, and irrigation networks.
  • Internal stormwater drainage network.
  • Electrical installations, including generator sets (Gensets).
  • External aqueduct networks.

Specifically, the project includes:

The inlet works.

  • Installation of a hydro turbine for energy production with a nominal capacity of 148 kW.
  • A storage tank for untreated water, which can supply the irrigation network.
  • Pre-aeration tank.
  • Pre-ozonation unit.
  • Ozone generation unit.
  • Service building for the pre-ozonation unit and a water supply/firefighting storage tank.
  • Distribution shaft.
  • Rapid mixing tanks.
  • Three coagulation-sedimentation tanks.
  • A five-bed filtration unit.
  • Backwash water storage tank.
  • Clean water storage tank.
  • Wastewater treatment unit for backwash water.
  • Gravity thickener.
  • Dewatering building.
  • Chemical building.
  • Workshop building.
  • Administration building.
    Guard post.